Concrete Calculator for Slabs, Footings and Columns

Enter the measurements in feet and inches or in metres and centimetres, and the calculator tells you how much concrete to order in cubic yards, cubic feet and cubic metres, with the waste margin you choose, and how many 40, 60 or 80 lb premix bags it takes.

Works anywhere in the world, wherever you are.

Units
What are you pouring?

10% is common practice on site; change it if your contractor uses another margin.

Concrete to order

1.36 yd³

Waste included (10%)

m³
1.04 m³
ft³
36.67 ft³
Measured volume
33.33 ft³
Bags of 80 lb
62
Bags of 60 lb
82
Bags of 40 lb
123

Bags use the yield the manufacturer publishes for QUIKRETE Concrete Mix No. 1101: about 0.6 ft³ for 80 lb, 0.45 for 60 lb and 0.3 for 40 lb. Other mixes (high-strength, fast-setting) yield differently: check the bag you are buying.

QUIKRETE Concrete Mix No. 1101 data sheet (approximate yield per bag). Reviewed November 2026.

A material estimate, not a design. Structural footings, columns and slabs need rebar and dimensions set by an engineer under the building code; confirm quantities with your contractor or supplier before you buy.

About this calculator

How it works

Slab: length × width × thickness. Footing: length × width × depth, times the number of identical footings; for a continuous footing, the length is the sum of every run. Round column: π × radius² × height, times the number of columns.

Solid steps poured on grade: each step is a block of width × run × rise, and the bottom one carries the ones above, so three steps are 1 + 2 + 3 = 6 blocks.

Inches are divided by 12 to turn them into feet before multiplying, the most common mistake when doing this by hand. One cubic yard is 27 cubic feet, and one cubic metre is about 35.31 cubic feet.

The waste allowance (10% to start) is added to the measured volume, and bags are counted from that total, always rounding up: nobody sells half a bag.

Examples

A 10 × 10 ft slab 4 inches thick measures 33.33 cubic feet. With 10% waste you order 36.67 cubic feet, which is 1.36 cubic yards or 1.04 cubic metres. In bags: 62 of 80 lb, 82 of 60 lb or 123 of 40 lb.

The same sum in metres: a 3 × 3 m slab 10 cm thick is 0.9 cubic metres; with 10% waste, 0.99 cubic metres, or 59 bags of 80 lb.

Four round columns 12 inches across and 8 feet tall add up to 25.13 cubic feet. With the extra 10% that is 27.65 cubic feet (1.02 cubic yards), or 47 bags of 80 lb.

What each bag yields

The calculator uses the yield the manufacturer publishes on the data sheet for QUIKRETE Concrete Mix No. 1101: an 80 lb bag yields about 0.60 cubic feet of mixed concrete, a 60 lb bag about 0.45 and a 40 lb bag about 0.30.

These are approximate, and other bagged mixes, such as high-strength or fast-setting ones, yield differently. Before you buy, check the yield printed on the bag you are going to use.

When the bag count gets large, ask your supplier about ready-mix concrete by truck: it is ordered by the cubic yard or cubic metre, the figures the calculator gives you.

Why add waste

Some concrete is always lost: what stays in the wheelbarrow and the mixer, ground that was not perfectly level, forms that bow a little. Running short halfway through a pour leaves a cold joint, which costs more than a few spare bags.

Adding about 10% is common practice on site, not a published rule. That is why the field is editable: if your contractor works with another margin, use theirs.

Important limitations

  • A material estimate, not a structural design. Slab thickness, footing and column dimensions and the rebar they need are set by an engineer under the building code and the job's permit.
  • Bags are counted with the approximate yield of QUIKRETE Concrete Mix No. 1101. Other brands and products yield differently.
  • It does not work out cement, sand and gravel proportions for mixing on site: that recipe depends on the strength required and the materials, and should come from your engineer or supplier.
  • It leaves out base material (fill, gravel), rebar, mesh and formwork. Confirm quantities with your contractor or supplier before you buy.

Frequently asked questions

Before waste, 45 bags of 80 lb, 60 of 60 lb or 90 of 40 lb, using the yield QUIKRETE publishes for its Concrete Mix. With 10% waste, the calculator raises those counts.

At 4 inches thick, 33.33 cubic feet measured; with 10% waste, 1.36 cubic yards, or 62 bags of 80 lb. A thicker slab raises the volume in the same proportion.

Yes. Switch to "Metres and centimetres" at the top of the calculator; the measurements you already typed convert on their own, and the result comes out in cubic metres, cubic yards and cubic feet.

No. The proportions of a site-mixed batch depend on the strength the job needs and the materials you use, and references do not agree on a single conversion factor. For that, ask your engineer or supplier.

It is the margin commonly used to cover spills, uneven ground and forms that bow. It is not an official rule: change it in the waste field if your contractor uses another.